![]() |
|
|
|||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Track Details Western Districts Live steamers have two separate tracks in operation the original raised level track caters for 2 ½ ,3 ½ , and 5 inch gauges and is 184 metres in length. Air water and 12 volts are available in the steaming bays. The second larger ground level track caters for the larger 5 and 7 ¼ inch gauge locomotives. Length of the main running lines is 645 metres in addition to this the length of sidings, loops etc. is 540 metres thereby giving a total length of 1.185 km. Air, water and 12 volts are also available in the ground level steaming bays. A number of sidings are laid for the benefit of those who wish to operate scale freight trains. For further details see the track diagram.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||